A production guide to Hopewell Township’s April 2026 Film Ready ordinance: what triggers a permit, the four-business-day filing floor, the published hours, the fee ceilings, and the Fire District that has to be named alongside the Township on your certificate.

Hopewell Township is a Film Ready certified locality in Mercer County. The State list writes it “Hopewell Township (Mercer)” because a different Hopewell Township exists in Cumberland County.

Chapter 23 is complete enough to plan against, including hours, which many New Jersey ordinances leave out. What has not caught up is the paperwork: no application is published, every fee is a ceiling rather than a price, and the ordinance and its fee schedule count advance notice differently.

Information checked September 3, 2026

Checked Sep 3 2026
County
Mercer County
Film Ready treatment
Film Ready certified locality
State list entry
Listed as “Hopewell Township (Mercer)”, which is how the State distinguishes it from Hopewell Township in Cumberland County
Governing ordinance
Ordinance No. 26-1872, An Ordinance Adopting New Jersey’s Film Ready Program, creating Chapter 23. First reading March 16, 2026; adopted April 13, 2026
Fee schedule
§ 10-13, Film Ready Program Fees, headed “Fee (not to exceed)”, added by the same ordinance
Penalties
§ 3-28, added by the same ordinance. Up to $2,000, up to 90 days in jail, or up to 90 days of community service, or a combination. Each day is a separate violation
Earlier step
Resolution 25-385, October 21, 2025, establishing intent to seek Film Ready certification and adopting a Code of Conduct
Municipal starting point
Office of the Municipal Clerk
Municipal Clerk
Katherine Fenton-Newman
Clerk contact
609-737-0605 extension 6760. The Clerk’s office line is 609-537-0276
Deputy Clerk
Jessalyn Walters, 609-737-0605 extension 6620
Municipal Building
201 Washington Crossing-Pennington Road, Upper Level, Titusville, NJ 08560
Clerk office hours
Monday to Friday, 8:30 a.m. to 4:30 p.m. These are counter hours, not filming hours
Application
No public film permit application located on the Township site, checked September 3, 2026
Decision-maker
The Municipal Clerk issues the permit; the Township Administrator refuses, revokes and waives; the Chief of Police sets the police requirement
Standard lead time
At least four or more business days before the requested shooting date
Basic permit
$100 ceiling with four or more days’ advance notice of the first day of filming
Expedited permit
$250 ceiling with three or fewer days’ advance notice
Nonprofit and student permit
$25 ceiling, one time, no daily rate required
Public-property daily fee
$150 ceiling where the budget is under $20mm, $500 ceiling where it is over. A budget of exactly $20,000,000 is not priced
Private-property daily fee
No fee charged by the municipality
Street closures
Up to $5,000 per day
Public safety cost
The municipality’s standard hourly rates for police and fire, under an agreed public safety plan. The rates are not stated in the ordinance
Public-land insurance
$500,000 bodily injury to any one person and $1,000,000 in the aggregate for any occurrence, plus $300,000 property damage for each occurrence, with proof supplied to the Township and to Hopewell Fire District No. 1
Off-duty police
Conditional. Required only if the Chief of Police requires it under the agreed public safety plan
Filming hours
7:00 a.m. to 9:00 p.m. camera wrap, crew wrap 10:00 p.m., Monday through Sunday. Night restrictions apply only to projects with exterior filming
Appeals
To the Township Committee, filed within 10 days, heard within 30 days, with a deemed-reversal clause
State notification
Copies of an approved permit go to the Police and Fire Departments and to the NJ Motion Picture and Television Commission at njfilm@njeda.gov

Which Hopewell this is

Check the county before you file

Three different New Jersey governments answer to a version of this name, and only one of them is the certified locality.

Hopewell Township, Mercer County is the subject of this guide. Municipal Building at 201 Washington Crossing-Pennington Road, Titusville, and the State list entry reads “Hopewell Township (Mercer)”.

Hopewell Township, Cumberland County is a separate government at 590 Shiloh Pike, Bridgeton, with its own unrelated 2026 ordinances. General web searches surface it first.

Hopewell Borough is a separate Mercer County municipality with its own governing body inside the same valley. A Township permit is not a Borough permit.

Confirm the county on any document you receive. If a form, fee schedule or contact does not say Mercer, it is probably not this municipality.

Documented location character

The Township’s own America 250 material places Hopewell Township in the story of the Revolution: it records the connection to General Washington’s 1776 crossing of the Delaware River, and the march of the Continental Army through central New Jersey, including areas now part of the Township, toward the Battle of Trenton.

Township pages identify Titusville on the Delaware as the village where the Municipal Building and Woolsey Park sit, both on Washington Crossing-Pennington Road, and reference preserved farmland in the valley, including a land-trust farm preserve on Lambertville-Hopewell Road.

Read this first

A Revolutionary-era association is not a location and a Township event listing is not a filming permission. Woolsey Park and the Municipal Building are municipal property with their own scheduling; the preserved farms are owned by a land trust or by private owners.

Washington Crossing State Park, the Delaware and Raritan Canal corridor and the Delaware itself are State and interstate jurisdictions with their own permits, and a Township permit reaches none of them. Establish which authority owns the ground before you file anything.

Current source set

Hopewell Township is a recently certified municipality, and its film framework is new enough that the operating documents have not all caught up with the law.

  • Ordinance No. 26-1872, “An Ordinance Adopting New Jersey’s Film Ready Program”, which creates Chapter 23, Film Ready Program and adds § 3-28 (penalties) and § 10-13 (fees) to the Township Code. Read in full for this guide.
  • The Township’s INTRO 3-16-26 notice, recording introduction and passage on first reading at the March 16, 2026 meeting.
  • The Township’s Adopted Titles 4-13-26 notice, which states that at the regular meeting held Monday, April 13, 2026 the listed ordinances were read a second time and adopted, Ordinance No. 26-1872 among them.
  • Resolution 25-385 of October 21, 2025, establishing intent to seek Film Ready certification and adopting a Code of Conduct. That resolution predates the ordinance and is not the operative permit law.
  • The Township Committee minutes of May 4, 2026, recording the Mayor announcing that the Township has been officially certified Film Ready by the State.

A Township site search on September 3, 2026 found no film permit application, no fee worksheet, no insurance instruction sheet, no notice template and no dedicated film page. Ask the Clerk for the current approved form and for written confirmation of the adopted text and its effective date before you rely on any figure below. Because the chapter is recent, also ask whether the online Township Code has since absorbed Chapter 23, and work from the ordinance until it has.

Film Ready status

Hopewell Township appears on the New Jersey Motion Picture and Television Commission’s certified-localities list, verified September 3, 2026, where the entry is written “Hopewell Township (Mercer)”.

The Township’s own record agrees. The May 4, 2026 Township Committee minutes record the Mayor announcing that Hopewell Township has been officially certified Film Ready by the State, three weeks after the ordinance was adopted.

Certification describes municipal process readiness. It does not guarantee a permit, does not shorten the four-business-day filing floor, and does not reach County, State, federal, school, land-trust or private property inside the Township. Note also that the Fire District here is a separate taxing authority with its own board, and the ordinance gives it a role of its own.

No checked Township page names a film liaison or film permit representative. § 23-2 routes everything through the Municipal Clerk. Ask the Township to confirm the designated roles in writing.

When a permit is required

§ 23-2A requires a permit to film on public property, and on private property where the filming involves the use of public property for the operation, placement or storage of vehicles or equipment, including any temporary structure, barricade or device intended to restrict or block off pedestrian or vehicular traffic.

Note the wording. Several New Jersey ordinances written on the same State template say “temporary storage”. Hopewell Township’s text says storage, without the qualifier, which reads more broadly rather than less.

The permit must set out the approved location and the approved duration by specific reference to day or dates, and must be readily available for inspection by Township officials at all times at the filming site. Applications go to the office of the Municipal Clerk during normal business hours, on a form approved by the Clerk, with the fee set by the fee schedule.

§ 23-1 defines filming as still or motion pictures on film, videotape or a similar recording medium, for commercial or educational purposes intended for viewing on television, in theatres, on a major linear broadcast network or streaming platform, or for institutional uses. The chapter does not reach the filming of news stories within the municipality.

What counts as a major motion picture here

§ 23-1 names NBCUniversal including Peacock; Warner Bros. Discovery including New Line Cinema, HBO, DC Studios and Castle Rock Entertainment; Paramount Pictures including Miramax, MTV Films, Showtime, Skydance, Dreamworks and Nickelodeon Movies; Walt Disney Studios including 20th Century Studios, Searchlight Pictures, Hulu and Marvel Studios; Sony Pictures including Columbia Pictures, Screen Gems and Tristar Pictures; Amazon MGM Studios; Netflix Studios; A24. It adds any film budgeted at least $20,000,000 and any recurrent weekly television series programming.

This is the current State-template studio list, the same one Newton adopted in September 2025. It is materially more up to date than the 2023 lists still in force in some neighbouring municipalities.

Application and timing

  • Standard route: § 23-3A says no permit will be issued unless applied for at least four or more business days before the requested shooting date.
  • Waiver: the Township Administrator may waive the four-day period where, in the Administrator’s judgment, the applicant has obtained all related approvals and adjacent property owners or tenants do not need to be notified. Both conditions are written together.
  • Weather: if filming does not take place on the permitted dates because of inclement weather or other good cause, the Clerk may issue a new permit for other dates at the applicant’s request, with no additional fee.
Unresolved conflict

The chapter counts business days and the fee table counts plain days. This guide does not reconcile them.

§ 23-3A: at least four or more business days before the requested shooting date.

§ 10-13: the $100 basic permit applies “with 4 or more days advance notice of the first day of filming”, and the $250 expedited permit “with 3 or less days advance notice”. Neither row says business days.

A Thursday filing for a Wednesday shoot is four business days but six plain days. A Friday filing for a Tuesday shoot is two business days but four plain days. The two provisions can classify the same application differently. Ask the Clerk which count applies to the fee and get it in writing before you file.

There is no published application form. § 23-2B says applications are made on a form approved by the Municipal Clerk, so the form exists as a matter of law even though it is not on the website. Contact the Clerk’s office for the current version rather than adapting another municipality’s form, and ask whether email submission and electronic payment are accepted.

Published fee ceilings

§ 10-13 is headed “FEE (not to exceed)”. Every figure below is therefore a maximum the Township may charge, not a price it has quoted you. Ask for a written project-specific quote.

CategoryFee, not to exceed
Basic filming permit, one time, with 4 or more days advance notice of the first day of filming$100
Expedited basic filming permit, one time, with 3 or fewer days advance notice$250
Basic filming permit for nonprofits, including student films, one time, no daily rate required$25
Daily filming on public property, budget under $20mm$150
Daily filming on public property, budget over $20mm$500
Daily filming on private propertyNo fee charged by the municipality
Off-duty police and fire inspections, per the agreed public safety planThe municipality’s standard hourly rates for police and fire
Street closuresUp to $5,000 per day
Properties in the background of, or used in, a shotNegotiated between the production company and the private business or residence
Daily prep of a business being “dressed”Negotiated between the production company and the private business or residence
Unpriced band

A budget of exactly $20,000,000 is not priced. The daily rows read only “under $20mm” and “over $20mm”. Separately, § 23-1 defines a major motion picture to include any film budgeted at least $20,000,000.

Do not read one provision across the other to fill the gap. Obtain a written fee classification from the Township for any budget at or near that figure.

The last two rows are worth reading carefully. They confirm that background and dressed-business payments are private commercial arrangements between the production and the owner, not municipal charges, and that the Township does not set or collect them.

§ 23-9 adds reimbursement on top of the fees: the applicant reimburses the Township for lost revenue such as parking meter revenue, repairs to public property, or other revenue the Township was prevented from earning because of the filming. That is not capped. § 3-28 sets penalties of up to $2,000, up to 90 days in jail, or up to 90 days of community service, or a combination, with each day a separate violation.

Insurance, the Fire District and public safety

Two named entities

Hopewell Township is unusual: proof goes to two bodies, not one. § 23-3B requires the applicant to satisfy the municipality and Hopewell Fire District No. 1, and the written indemnity must save harmless the municipality and the local Fire District.

The Fire District is a separate taxing authority with its own Board of Fire Commissioners. Naming it correctly on the certificate and in the indemnity is not a formality, and a certificate that names only the Township may be rejected. Ask the Clerk for the exact certificate-holder and additional-insured wording for both entities before you bind coverage.

The limits are:

  • Bodily injury to any one person: $500,000, and any occurrence in the aggregate: $1,000,000.
  • Property damage for each occurrence: $300,000.
  • A written agreement indemnifying and saving harmless the municipality and the local Fire District from any and all liability, expense, claim or damages resulting from the use of public lands.

Police are conditional here. § 23-3B(3) requires the hiring of an off-duty police officer if required by the Chief of Police, according to the agreed public safety plan, for the times indicated on the permit. § 23-5B lets the Chief require one or more on-site patrolmen where the production may impede the proper flow of traffic, again under the agreed public safety plan, at the applicant’s cost as a cost of production.

That is a real difference from neighbouring municipalities where an officer is mandatory on every public-property day. It is also a reason to open the public safety conversation early rather than late: the plan drives the requirement, and the requirement drives the cost, which § 10-13 leaves at the municipality’s standard hourly rates rather than publishing a number.

Where existing electrical power lines are to be used by the production, § 23-5B allows an on-site licensed electrician to be required if the production company does not have one on staff.

The ordinance sets no bond. That is not the same as a confirmation that no deposit will be requested, so ask.

Filming hours

§ 23-3D publishes hours, which many New Jersey filming ordinances do not.

  • Filming is permitted 7:00 a.m. to 9:00 p.m. (camera wrap), with crew wrap at 10:00 p.m., Monday through Sunday.
  • Night filming restrictions apply only to a project with exterior filming.
  • Exterior filming in residential zones outside those hours must be approved in the permit, granted in accordance with the § 23-7 waiver factors.

The chapter does not say how arrival, setup, strike and departure sit against those times, and it does not define the residential zones by name. An interior shoot is not expressly limited by the night restriction, but the permit still governs. Put your intended call, camera wrap and crew wrap in the application and ask for them to be written into the permit.

Notice to neighbours

§ 23-4A requires the permit holder to conduct filming so as to minimise inconvenience or discomfort to adjoining property owners, and, to the extent practicable, to abate noise and park production vehicles off the public streets.

§ 23-4B is the notice rule. Where the production will directly involve or affect businesses, merchants or residents, those parties must be given written notice at least three days before the requested shooting date and told that objections may be filed with the Municipal Clerk. Objections form part of the application and are considered in reviewing it.

Unresolved timing

The proof-of-service deadline does not say before or after. § 23-4B: “Proof of service of notification to adjacent owners shall be submitted to the Municipal Clerk within two days of the requested shooting date.”

Two days before the shoot sits inside the three-day notice window. Two days after would mean the Clerk approves a permit before seeing proof. The text supports both readings and this guide does not choose between them. Ask the Clerk for the exact due date and the accepted form of proof.

There is also a sequencing point worth planning around: the standard filing floor is four business days, while neighbour notice is three days. If you file at the floor, notice has to go out almost immediately, and objections can land while the application is still being reviewed.

No notice template is published. Ask whether the Township has an approved letter format and what it must contain.

Refusal, waiver and appeal

§ 23-5A lets the Township Administrator refuse a permit on the basis of objective facts, after reviewing the application and a report on it from the Police Department, the Fire District and other Township agencies involved with the proposed site, where filming at that location or time would violate a law or ordinance, unreasonably interfere with the use and enjoyment of adjoining properties, unreasonably impede the free flow of vehicular or pedestrian traffic, or otherwise endanger public health, safety or welfare.

§ 23-7 lets the Administrator waive any requirement of the chapter where that can be done without endangering public health, safety and welfare. The stated factors are traffic congestion at the location, the applicant’s ability to remove vehicles and equipment from public streets or other public property, the extent of any requested restriction on public streets or parking facilities, the nature of the filming including whether it is indoors or outdoors and the proposed hours, the effect on adjoining and nearby owners and occupants, and the Township’s prior experience with the applicant. This is the route for exterior night work in residential zones.

§ 23-6 sets the appeal. A person aggrieved by a decision denying or revoking a permit, or requesting relief, may appeal to the Township Committee by filing a written notice of appeal with the Administrator within 10 days of the decision. The Committee sets a hearing within 30 days of filing and decides by resolution at its first regular meeting after the hearing, unless the appellant agrees in writing to a later date. If no resolution is adopted in time, the Administrator’s decision is deemed reversed and a permit issues in conformity with the application, or the relief is deemed denied.

§ 23-8 requires copies of the approved permit to go to the Police and Fire Departments before filming and to the New Jersey Motion Picture and Television Commission at njfilm@njeda.gov. The Fire Prevention Bureau and other Township inspectors may inspect the site and the equipment, and their safety instructions must be followed.

Who controls the location?

A Hopewell Township permit reaches Township public property. It does not reach the following:

Washington Crossing State Park and the Delaware corridor

The park and the river frontage the Township’s own history material describes are State jurisdiction. Commercial filming there runs through the New Jersey State Park Service and, on the water or the far bank, through Pennsylvania and interstate authorities. None of that is reachable through the Municipal Clerk.

The Delaware and Raritan Canal State Park corridor

The canal corridor is State park land with its own permit process, whatever municipality it runs through.

County roads and Mercer County property

Mercer County controls its own roadways and facilities. Establish the owner of the surface you intend to occupy before filing, because a Township permit will not cover a County road closure.

Preserved farmland and land-trust property

Farm preserves in the valley are held by land trusts or by private owners under easement. Preservation status is not public access, and a ribbon-cutting listed on a Township events page is not a filming permission.

Schools, the Fire District and private property

The school district, the Fire District and every private interior, storefront, farm and residence control their own premises. § 10-13 expressly leaves background properties and dressed businesses to negotiation between the production and the owner, which confirms those are not municipal charges and not municipal permissions.

Documented productions

No completed production credit for Hopewell Township was located in the official sources checked for this guide. The Township is newly certified, and the absence of a credit is a statement about the record, not about the municipality’s suitability.

Do not infer a Hopewell Township shoot from a Mercer County reference, from a Washington Crossing credit, which is more likely to be the State park, or from anything attributed to Hopewell Borough.

Practical production planning

A working sequence for Hopewell Township, based only on the checked sources:

  • Confirm the county on every document. Mercer, not Cumberland, and Township, not Borough.
  • Establish jurisdiction before you file. The most photogenic ground near Titusville is State park, river corridor or preserved farmland, none of which a Township permit reaches.
  • Call the Municipal Clerk for the current approved application form, since none is published, and ask for written confirmation of the adopted ordinance text and its effective date.
  • File at least four business days out, and ask which day count the fee table uses, because the chapter and the fee schedule count differently.
  • Ask for a written fee quote. Every figure in § 10-13 is a ceiling, and a budget at exactly $20,000,000 is not priced at all.
  • Open the public safety plan conversation early. Police are conditional on the Chief of Police here, and the cost is at standard hourly rates that are not published.
  • Bind insurance naming both the Township and Hopewell Fire District No. 1, and get the exact wording for both before binding.
  • Serve neighbour notice at least three days out and ask the Clerk for the exact proof-of-service due date rather than guessing which way the two-day clause runs.
  • Schedule to a 9:00 p.m. camera wrap and a 10:00 p.m. crew wrap, and treat exterior night work in residential zones as a waiver application rather than a scheduling choice.
  • Ask what § 23-9 reimbursement is likely to cover for your streets, and when it is billed.

Common questions

Is Hopewell Township a Film Ready certified community?

Yes. The Township appears on the New Jersey Motion Picture and Television Commission’s current certified-localities list as “Hopewell Township (Mercer)”, verified September 3, 2026. The Township adopted Ordinance No. 26-1872 on April 13, 2026 after first reading on March 16, 2026, and the Mayor announced official State certification at the May 4, 2026 Township Committee meeting. Certification does not guarantee a permit and does not reach County, State, federal, school, land-trust or private property.

Which Hopewell is this?

Hopewell Township in Mercer County, whose Municipal Building is at 201 Washington Crossing-Pennington Road, Titusville. It is not Hopewell Township in Cumberland County, a separate government at 590 Shiloh Pike, Bridgeton whose 2026 ordinances are unrelated and which surfaces first in general web searches. It is also not Hopewell Borough, a separate Mercer County municipality with its own governing body.

How far ahead do I have to apply for a Hopewell Township film permit?

Section 23-3A says no permit will be issued unless applied for at least four or more business days before the requested shooting date. The Township Administrator may waive that period where the applicant has obtained all related approvals and adjacent owners or tenants do not need to be notified. The fee schedule bands advance notice in plain days rather than business days, so ask the Clerk which count applies to your fee.

How much is a Hopewell Township film permit?

Section 10-13 is headed “Fee (not to exceed)”, so every figure is a ceiling rather than a quoted price. The ceilings are $100 basic with four or more days advance notice, $250 expedited with three or fewer, $25 for nonprofits including student films, and daily public-property filming of $150 where the budget is under $20mm or $500 where it is over. Filming on private property carries no municipal fee. Street closures are up to $5,000 per day. Ask the Township for a written project-specific quote.

What happens if the budget is exactly $20,000,000?

The fee table does not price it. The daily rows read only “under $20mm” and “over $20mm”. Separately, Section 23-1 defines a major motion picture to include any film budgeted at least $20,000,000. Obtain a written fee classification from the Township rather than reading one provision across the other.

What are Hopewell Township’s filming hours?

Section 23-3D permits filming from 7:00 a.m. to 9:00 p.m. camera wrap, with crew wrap at 10:00 p.m., Monday through Sunday. Night filming restrictions apply only to a project with exterior filming, and exterior filming in residential zones outside those hours has to be approved in the permit under the Section 23-7 waiver factors. The chapter does not say how setup, strike and departure sit against those times.

Who has to be named on the insurance certificate?

Two bodies. Section 23-3B requires proof of insurance to be supplied to the municipality and to Hopewell Fire District No. 1, and the written indemnity must save harmless the municipality and the local Fire District. The limits are $500,000 bodily injury to any one person, $1,000,000 in the aggregate for any occurrence, and $300,000 property damage for each occurrence. The Fire District is a separate authority, so ask the Clerk for the exact certificate-holder and additional-insured wording for both entities before binding coverage.

Do I need an off-duty police officer in Hopewell Township?

Only if the Chief of Police requires one. Section 23-3B(3) makes the hiring of an off-duty officer conditional on the Chief requiring it according to the agreed public safety plan, and Section 23-5B lets the Chief require on-site patrolmen where the production may impede traffic. That is different from neighbouring towns where an officer is mandatory on every public-property day. The cost is charged at the municipality’s standard hourly rates for police and fire, which the ordinance does not state.

Is there a Hopewell Township film permit application I can download?

No. A Township site search on September 3, 2026 found the introduction and adoption notices, the 2025 intent resolution and the meeting minutes, but no application form, fee worksheet, insurance instruction or notice template. Section 23-2B says applications are made on a form approved by the Municipal Clerk, so the form exists as a matter of law. Contact the Clerk’s office at 609-737-0605 extension 6760 for the current version.

Planning a production in New Jersey?

BLL Films provides production support for interviews, commercials, branded content, documentary work and other productions across New Jersey. We can help translate a creative brief into a practical crew, equipment and location plan.

Ask about your New Jersey production

BLL Films may provide crew, equipment or production services when requested.

BLL
Reviewed by Sam Moskowitz, producer & director of photography

This guide is researched and reviewed by Sam Moskowitz, a New Jersey-based producer and DP who runs BLL Films. Sam’s production and cinematography credits include work for Netflix, History Channel, Hulu, the NFL and Google. Every changing fact on this page carries a verification date; see how this site is researched for the full process.

More town production guides

Comparing municipalities? See every Film Ready town in New Jersey, or search a specific town’s published permit, fee and contact details in the New Jersey Film Permit Finder.

New Jersey Film Locations is an independent production resource created by BLL Films. It is not affiliated with the State of New Jersey, the New Jersey Motion Picture & Television Commission, NJEDA or any municipal government. Requirements, fees, availability and incentive rules can change. Confirm current information with the appropriate agency, municipality, property owner or qualified professional before making production decisions.