Filming in Weehawken, New Jersey
Weehawken charges two separate fees, allows filming Monday through Friday only, and requires one permit for each location.
Everything below comes from § 4-9 of the Township Code, read in full on September 17, 2026, and cross-checked against Appendix A, Schedule of Fees. The two agree. The ordinance dates from 1990 and its fees have not changed since, which makes it one of the more stable published schedules in Hudson County.
Information checked September 17, 2026
- County
- Hudson County
- Film Ready status
- Not on the current State certified-localities list, checked September 17, 2026. Weehawken has had its own filming ordinance since 1990; certification and a permit process are separate things.
- Controlling source
- Township Code § 4-9, Commercial Filming and Photography (Ord. No. 17-1990)
- Who decides
- The Township Manager or a designee
- Published lead time
- At least 10 days before the requested filming date
- Application fee
- $25, non-refundable, due with the application
- Public-land permit fee
- $500 — or $25 for nonprofit applicants filming for educational purposes
- Performance deposit
- Certified check of $1,000, or a higher figure set by the Manager, refunded after full performance
- Insurance
- $1,000,000 bodily injury per person, $3,000,000 aggregate per occurrence, $500,000 property damage aggregate per occurrence, naming the Township as assured
- Days permitted
- Monday through Friday only
- Hard curfew
- No filming in a residential area after 11:00 p.m.
- Permit validity
- Four days of filming, one permit per location, applied for no more than 90 days in advance
- Last verified
- September 17, 2026
Weehawken requires a permit for commercial filming, and there are two fees, not one: a $25 application fee that must accompany the application, plus a $500 permit fee for filming on public land. Both are non-refundable.
Two rules shape the schedule more than the money does. Filming is permitted Monday through Friday only, and one permit covers one location. A weekend exterior or a two-location day is not a variation on the standard permit — it is a different conversation with the Township.
Who issues the permit
Applications are obtained from and filed with the Office of the Township Clerk during normal business hours, and are reviewed and acted upon by the Township Manager or a designee under § 4-9.2c. The Director of Public Safety has a separate role: § 4-9.3i gives that office the decision on how many off-duty officers a location needs, and § 4-9.3p requires a copy of the permit to reach the Director at least three days before filming begins.
A completed application must be with the Clerk at least 10 days before the requested filming date, with the $25 application fee attached. The ordinance gives no waiver of the 10 days, which is worth noting: several nearby municipalities allow one and Weehawken’s text does not.
No application form is published online
The Township Clerk’s page publishes an OPRA request form and vital-records information, but no film permit application. § 4-9.2b says applications are obtained from the Clerk’s office in person during business hours, and that appears to be the actual route. Call before you travel.
What the application has to contain
§ 4-9.2b lists nine items, and they are more operational than most municipal film applications in New Jersey. Have these settled before you file:
- The number of actors, extras, crew and everyone else participating
- The estimated number and types of vehicles, including transportation vehicles
- Parking arrangements for crew and work vehicles
- Sanitary arrangements for crew and bystanders
- Crowd control measures
- A description of every location area for filming or incidental activities
- Cleanup methods
- Any special electrical requirements and how they will be met, including all electrical permits required
- Anything else the Township asks for to protect public health, safety and welfare
§ 4-9.3n3 gives that list teeth: the Manager may refuse a permit where the applicant has not established adequate measures for parking, sanitary facilities, crowd control and cleanup. A thin application is a refusable application.
Fees, and the two people often confuse
| What | Amount | Source |
|---|---|---|
| Permit application fee, due with the application | $25 | § 4-9.4a |
| Filming permit for filming on public land | $500 | § 4-9.4b |
| Filming permit, nonprofit applicant, educational purposes, on public land | $25 | § 4-9.4c |
| Performance deposit, certified check, refunded after full performance | $1,000 or higher as set by the Manager | § 4-9.3h |
| Wedding filming, short-form application fee | $50 | § 4-9.6c |
All permit fees are non-refundable. The $1,000 is different in kind: it is a certified check held against performance of the obligations in the ordinance and the permit, and § 4-9.3h says any money remaining after full performance is returned. Appendix A files it under the heading “Performance Bond”, but the ordinance text calls for a certified check, so plan on a check.
Both the $25 and the $500 apply to a public-land shoot. Quoting Weehawken as a “$25 town” understates it by twentyfold.
These figures are restated verbatim in Appendix A, Schedule of Fees, so the two published sources agree. They have not changed since Ord. No. 17-1990. Confirm them with the Clerk before budgeting anyway.
Insurance and indemnity
§ 4-9.3b requires a certificate of insurance naming the Township of Weehawken as the assured, not merely as an additional insured, with:
- Bodily injury cover of $1,000,000 for any one person and $3,000,000 in the aggregate for any one occurrence
- Property damage cover of $500,000 in the aggregate per occurrence
A written agreement indemnifying and holding the Township harmless is also required, and § 4-9.3b2 spells out that it covers attorneys’ fees and other costs of litigation.
These limits are higher than most municipalities on this site — the aggregate bodily injury figure is triple the common $1,000,000 — and the “named as assured” wording is not the same instruction a broker usually receives. Send the ordinance text to your broker rather than a summary of it.
Notice, police, streets and electricians
Several obligations in § 4-9.3 attach to the permit holder rather than to the application, and each one can move a schedule.
- Notice to those affected (§ 4-9.3c). Where the activity will directly involve or affect any business, merchant or resident, the applicant must give written notice within three days after filing the application describing the activities and stating that objections may be filed with the Township Clerk. Objections received are considered by the Manager.
- Notice of parking restrictions (§ 4-9.3f). Affected residents get at least three days’ notice of parking restrictions and other inconveniences.
- Off-duty officers (§ 4-9.3i). Each film location must have the number of off-duty Weehawken police officers, or other officers approved by the Director of Public Safety, that the Director determines. The cost is paid by the applicant in advance.
- Street closures (§ 4-9.3k). No public street may be closed without the permission of the Mayor and Township Council. That is a governing-body decision, not a staff approval, so it runs on the Council’s meeting calendar.
- On-site electrician (§ 4-9.3j). A licensed electrician may be required on site at the applicant’s expense where the Manager deems it appropriate.
- Inspections (§ 4-9.3l). The Manager may require fire, electrical, building, plumbing or other inspections of the location and the equipment, at the applicant’s expense.
- Restoration (§ 4-9.3g). Immediately on completion or expiry, whichever comes first, all equipment and debris must be removed and affected land restored to its prior condition.
Note the direction of the § 4-9.3c clock. Most municipal notice periods run backwards from the shoot; this one runs forwards from the filing date. File early and the notice goes out early.
Days, hours and conduct on site
§ 4-9.3a is the shortest subsection in the ordinance and the one most likely to break a schedule: filming is permitted only Monday through Friday, and in no event in a residential area after 11:00 p.m.
The ordinance sets no morning start time and no general evening cutoff outside residential areas. What it does instead is oblige the permit holder, under § 4-9.3e, to conduct filming so as to minimize inconvenience or discomfort to adjoining property owners, to abate noise so far as practicable, to park vehicles associated with the filming off the public streets to the extent practicable, and to avoid interference with previously scheduled activities on public lands.
§ 4-9.3d adds the standard obligation to minimize interference with the free passage of pedestrians and traffic and to comply with all lawful directives of the Weehawken Police Department.
Refusal, appeal and bad weather
§ 4-9.3n lets the Manager refuse a permit, or revoke one already issued, where the applicant has not met the permit requirements, or where filming at that location or time would violate a law or ordinance, unreasonably interfere with the use and enjoyment of adjoining properties, unreasonably impede vehicular or pedestrian traffic, or otherwise not be in the best interests of public health, safety or welfare — or where parking, sanitary facilities, crowd control and cleanup have not been adequately provided for.
An appeal goes to the Mayor and Council. Written notice of appeal setting out the reasons is filed with the Township Clerk within 10 days of the decision, and the Council must set a hearing within 30 days of that filing. If no hearing is held in time, § 4-9.3o deems the Manager’s decision affirmed — note the direction: silence upholds the refusal here, which is the opposite of how some neighboring ordinances resolve it.
Weather is handled generously. Under § 4-9.3m, if filming does not take place on the permitted dates because of adverse weather or other good cause, the Manager may issue a revised permit for alternate dates without an additional permit fee.
Penalties under § 4-9.5 run to a fine of up to $500, imprisonment for up to 30 days, or both.
What does not need a permit
§ 4-9.6 exempts three things, and the second is the one worth knowing:
- News. Filming of news stories.
- Small private shoots. Filming intended solely for private, non-commercial use involving two or fewer crew members. Three people and the exemption is gone.
- Weddings, provided the applicant files a completed short-form application with a $50 fee and proof of insurance at the lower wedding limits: $500,000 bodily injury per person, $1,000,000 aggregate per occurrence and $300,000 property damage aggregate per occurrence.
Note how broad the definition it sits under is. § 4-9.1 defines filming as the taking of still or motion pictures on film, videotape or similar recording equipment for any purpose — not “for commercial purposes”, as several neighboring ordinances have it. The section heading says “Commercial Filming and Photography”; the operative definition does not. If your shoot is not clearly inside one of the three exemptions, assume a permit is required and ask.
Practical production planning
- Budget $525 for a one-location public-land day, not $25, plus the $1,000 certified check you expect back.
- Check the calendar first. Monday to Friday only is the constraint that most often makes Weehawken the wrong answer for a weekend exterior.
- Count your locations, then multiply. One permit, one location.
- Get insurance moving early: $1m per person, $3m aggregate, $500k property damage, Township named as assured.
- Four days maximum per permit, and no more than 90 days ahead. A long schedule needs sequencing rather than one filing.
- If you need a street closed, add the Mayor and Council meeting calendar to your timeline before anything else.
- The three-day notice to affected businesses and residents runs from the day you file. Draft the notice at the same time as the application.
- Ask about off-duty officers early. The number is the Director of Public Safety’s call and the cost is payable in advance.
Common questions
Do I need a film permit in Weehawken?
Yes, for almost anything. Township Code § 4-9.2a requires a permit before filming commences anywhere in the Township, and § 4-9.1 defines filming as taking still or motion pictures for any purpose. Only three things are exempt: news stories, filming solely for private non-commercial use with two or fewer crew members, and weddings on a short-form application with a $50 fee.
How much does a film permit cost in Weehawken?
Two fees apply to a public-land shoot: a $25 application fee due with the application, and a $500 filming permit for filming on public land. Nonprofit applicants filming for educational purposes pay $25 instead of $500. All permit fees are non-refundable. A certified check of $1,000, or a higher amount set by the Township Manager, is also required and is refunded after full performance.
How far in advance do I apply for a Weehawken film permit?
A completed application must reach the Township Clerk at least 10 days before the requested filming date, under § 4-9.2b. Permits may not be obtained more than 90 days in advance of the first scheduled filming date. The ordinance provides no waiver of the 10-day period.
Can I film on a weekend in Weehawken?
Not under the ordinance as written. § 4-9.3a permits filming only Monday through Friday. It also bars filming in a residential area after 11:00 p.m. on any permitted day. If your schedule needs a Saturday or Sunday, raise it with the Township before you plan around it rather than after.
What insurance does Weehawken require for filming?
Under § 4-9.3b, a certificate naming the Township of Weehawken as the assured, with bodily injury cover of $1,000,000 for any one person and $3,000,000 in the aggregate for any one occurrence, and property damage cover of $500,000 in the aggregate per occurrence. A written indemnity covering attorneys' fees and other costs of litigation is also required. Wedding filming uses lower limits of $500,000, $1,000,000 and $300,000.
How many locations does one Weehawken permit cover?
One. § 4-9.2d states that one permit is required for each location, and § 4-9.2e limits a permit to no more than four days of filming. A two-location day means two permits, each with its own public-land fee where public land is used.
Who approves a street closure for filming in Weehawken?
The Mayor and Township Council. § 4-9.3k states that no public street may be closed in connection with filming without their permission, which makes it a governing-body decision rather than a staff approval. Off-duty police staffing is a separate decision, made by the Director of Public Safety under § 4-9.3i, with the cost paid by the applicant in advance.
Is Weehawken a Film Ready certified community?
No. Weehawken does not appear on the New Jersey Motion Picture & Television Commission’s current certified-localities list, checked September 17, 2026. That is a State certification program and is separate from having a permit process; Weehawken has had its own filming ordinance since 1990.
Who do I contact about filming in Weehawken?
The Office of the Township Clerk, second floor, Weehawken Town Hall, 400 Park Avenue, Weehawken, NJ 07086, on (201) 319-6022, Monday to Friday 9:00 a.m. to 4:00 p.m. No film permit application form is published on the Township website, so expect to collect it in person.
Official sources
- OfficialTownship of Weehawken Code § 4-9, Commercial Filming and Photography (Ord. No. 17-1990), in Chapter 4, General Licensing
- OfficialTownship of Weehawken Code, Appendix A, Schedule of Fees — filming fees restated
- MunicipalTownship of Weehawken, Office of the Township Clerk
- MunicipalTownship of Weehawken, municipal code
- OfficialNJMPTVC Film Ready certified-localities list, checked September 17, 2026
Township Code § 4-9 and Appendix A were read in full on September 17, 2026. Film Ready status was checked against the State certified-localities list the same day. Municipal requirements, fees and staffing change; confirm with the Township before relying on any figure. Report a correction or updated permit requirement.
Planning a production in New Jersey?
BLL Films provides production support for interviews, commercials, branded content, documentary work and other productions across New Jersey. We can help translate a creative brief into a practical crew, equipment and location plan.
Ask about your New Jersey productionBLL Films may provide crew, equipment or production services when requested.
This guide is researched and reviewed by Sam Moskowitz, a New Jersey-based producer and DP who runs BLL Films. Sam’s production and cinematography credits include work for Netflix, History Channel, Hulu, the NFL and Google. Every changing fact on this page carries a verification date; see how this site is researched for the full process.
More town production guides
Comparing municipalities? See every Film Ready town in New Jersey, or search a specific town’s published permit, fee and contact details in the New Jersey Film Permit Finder.